WLS helps customer with new math: Steel Box

Fabricated Steel Box

This part was originally produced by welding three separate parts together. It was expensive, time consuming, and did not add up to our customers expectations.

WLS was asked to review this part in relation to the “whole” of the project. Within a couple of weeks, we developed a “total lower cost” plan and designed a way to fabricate this part in one piece. The result was a significant reduction in lead time and an increase in quality. They love how it adds up now.

Material: Cold Rolled Soft Temper .075 inches
Lead Time: One week
Quantity: 100 units per release
 Finishing: Powder coat paint

 
Let us help lower your total cost. Request a WLS RapidQuote today.